Licensed & InsuredCA License #1109508

Repairs & Remodels · Published October 27, 2026 · 6 min read

Bathroom Remodel Plumbing Checklist: Relocating Drains, Shower Valves & Freestanding Tubs

Luxury bathroom remodel with freestanding soaking tub and walk-in shower completed by Prime Time Plumbing
Luxury bathroom remodel with freestanding soaking tub and walk-in shower completed by Prime Time Plumbing — Prime Time Plumbing (CA License #1109508)
Quick Homeowner Summary

A successful bathroom remodel requires completing all in-wall and subfloor rough-in plumbing before waterproof backer board and tile are installed—including relocating 2-inch shower drains, setting brass thermostatic or pressure-balancing shower valves to the exact finished tile depth, framing freestanding tub floor-mount rough-in boxes, and upgrading every shut-off angle stop to quarter-turn brass valves.

When remodeling a primary bathroom, guest bath, or kitchen in San Ramon, Danville, Dublin, or Pleasanton, the most important work happens behind the walls before a single tile is set. At Prime Time Plumbing, our 5.0-star licensed crew handles both the precision rough-in engineering and the white-glove final fixture installation.

1. Tub-to-Walk-In Shower Conversions: The 2-Inch Drain Upgrade

One of the most common bathroom remodel mistakes occurs when converting an old alcove bathtub into a modern curbless or low-threshold walk-in shower. Standard bathtubs use a 1.5-inch drain pipe, whereas California Plumbing Code requires a minimum 2-inch drain line and P-trap for walk-in showers to handle high-flow rain heads and body sprays without pooling:

  • Subfloor & Slab Drain Relocation: We open the subfloor or concrete slab to upsize the trap and branch drain to 2-inch ABS/PVC and center the drain precisely for linear or square tile grates.
  • Precision Shower Mixing Valve Depth: Every Kohler, Brizo, Delta, Moen, or Hansgrohe rough-in valve has a strict plaster-guard depth tolerance. We mount and pressure-test your copper shower manifold to match your exact thinset and stone/tile thickness.
  • Water Hammer Arrestors & Pipe Anchoring: We secure all hot and cold copper supply lines inside the wall cavity so pipes never rattle when valves close.

Explore our dedicated Bathroom & Kitchen Remodel Plumbing page to see how our licensed technicians handle installations, diagnostics, and municipal permits across San Ramon, Dublin, Pleasanton, and the East Bay.

2. Freestanding Soaking Tubs & Single-to-Double Vanity Conversions

Replacing a built-in deck tub with a sculptural freestanding soaking tub transforms a primary suite, but requires exact drop-in drain and floor-mounted or wall-mounted filler rough-in boxes. Likewise, upgrading a single-sink vanity to a 60- or 72-inch double vanity requires re-piping the in-wall sanitary tees, re-venting, and stubbing out symmetrical copper hot and cold supplies.

Finished glass walk-in shower and custom double vanity plumbing by Prime Time Plumbing
Finished glass walk-in shower and custom double vanity plumbing by Prime Time Plumbing

3. Don’t Skip Quarter-Turn Angle Stops & Smart Toilet Rough-Ins

Never reconnect brand-new designer faucets or toilets to 20-year-old multi-turn compression shut-off valves. During final trim, we install heavy-duty quarter-turn brass angle stops, braided stainless supply lines, and concealed water connections for modern bidet toilets.

2-Phase Bathroom & Kitchen Remodel Plumbing Schedule
Remodel Phase When It Happens What Prime Time Plumbing Completes
Phase 1: Rough-In Plumbing After demolition, before drywall/tile Drain relocation, 2" shower trap, copper shower valve, tub box & pressure test
Phase 2: City Inspection While walls & trenches are open Full water/air test verification for municipal building inspector
Phase 3: Finish Trim After tile, paint & countertops are done Installing freestanding tub, faucets, shower trim, toilets, sinks & leak check

Schedule Your Free Repairs & Remodels Estimate

Learn more on our Bathroom & Kitchen Remodel Plumbing page or request a fast quote from our San Ramon team.

Get a Free Quote

Frequently Asked Questions

When should I bring Prime Time Plumbing into my bathroom or kitchen remodel?

Ideally before demolition begins—once you have selected your plumbing fixtures (shower valve, tub, sinks, and toilets) so we can verify rough-in specifications and coordinate seamlessly with your tile setter or general contractor.

Can you install plumbing fixtures that I purchased myself?

Yes! We install homeowner-supplied and designer-specified fixtures from all major brands with scratch-free, white-glove care.

Do you also handle urgent everyday plumbing repairs?

Absolutely. Whether you need a leaking pipe repaired, a new main water shut-off valve, or a full custom bath remodel, our team is available 24/7 at (510) 213-8213.

Related Tri-Valley Plumbing Guides

Need a licensed Tri-Valley plumber today?

Call, text, or request your free estimate online from Prime Time Plumbing (CSLB #1109508).